Selling a House a Lender Called Structurally Unsound in MA
When an inspection or appraisal flags rotted sills, a sagging beam or a cracked foundation, the buyer's lender usually won't fund the loan until a structural engineer's letter says the house is sound or spells out the repairs. You can wait for that letter, repair first, or sell as-is to a cash buyer who prices the unknown and doesn't need a lender's sign-off.
The short answer
Picture a seller with an accepted offer and a closing date. Then the buyer’s inspector crawls under the back ell, pushes a screwdriver into a sill plate, and it goes in up to the handle. A week later the buyer’s lender wants a structural engineer’s letter before it will fund. The buyer has a contingency date coming up and a rate lock running out, and often walks before anyone has booked the engineer.
That’s how a lender ends up calling a house “unsound”. Usually it isn’t saying the house is about to fall down. It’s saying it won’t lend against the house until a professional explains the structure and the fix. From there you have three paths: get the letter and hope the next buyer stays, repair first and list again, or sell as-is to a buyer who doesn’t need a lender’s approval.
What makes a lender ask for an engineer’s letter
Lenders don’t inspect houses themselves. They rely on the appraiser’s notes and, in many cases, on what the buyer’s home inspector reports. Some findings almost always lead to a demand for a letter:
- Rotted sills. These are common in older Massachusetts houses where the sill sits close to grade or the gutters have dumped water against the foundation for years.
- A sagging carrying beam or a main girder held up by makeshift posts, stacked blocks or an old lally column that’s rusted at the base.
- A cracked or bowed foundation wall. Horizontal cracks and inward bowing worry engineers more than hairline vertical shrinkage cracks.
- Bowed or sloping floors that point to settlement, notched joists or an earlier renovation that took out a bearing wall.
- Water damage at the framing, such as soft subfloor near a bathroom or a joist end crumbling where it meets the foundation.
Government-backed loans tend to be the strictest, because the appraiser has to flag anything that affects safety or soundness. Conventional lenders vary. Once the word “structural” shows up in the file, though, most underwriters want an engineer to answer it before they’ll move.
What an engineer’s report does, and what it doesn’t
A structural engineer visits, looks at what can be seen, and writes up the condition, the likely cause and the recommended repairs. That has real value. It turns a vague worry into a specific finding, and sometimes the finding is mild. An old crack that stopped moving decades ago may need nothing more than monitoring.
But the report has limits, and sellers are often surprised by them:
- It isn’t a repair quote. The engineer says what should be done, not what it will cost.
- It only covers what the engineer can see. Engineers don’t usually open finished walls or pull up floors, so their reports often say “further investigation recommended”.
- It can make the lender’s list longer. If the letter recommends sistering joists or replacing a section of sill, the lender may then want those repairs finished and signed off before closing.
- It becomes something you know. Once you’ve read it, the findings are part of what you’re expected to answer honestly when buyers ask. Our guide on disclosure when selling as-is covers how that works. This is general information, not legal advice, so ask a Massachusetts real estate attorney about your own situation.
Why contractors won’t quote without opening the wall
Rot and settlement damage hide well. A sill can look fine on the outside and be soft for twelve feet behind the clapboards. A carrying beam might need one new post, or it might need replacing because the post above it has been sinking for years. A careful contractor can’t tell which until the trim, siding or plaster comes off.
So you’ll typically be offered one of three things: a wide range, a time-and-materials arrangement, or a price for opening the area up before a real quote. Structural work in Massachusetts also generally needs a building permit and an inspection by the local building department. The state’s Board of Building Regulations and Standards sets the code that permitted work is checked against. All of that takes time, and a financed buyer who is waiting usually won’t wait that long.
If the problem turns out to be the concrete itself rather than the framing, our separate guide on selling a house with a crumbling concrete foundation covers that issue.
Three ways forward, side by side
The table below compares the paths. Timeframes are rough and depend on how fast you can book engineers, contractors and inspectors, and on the buyer.
| Wait for the letter, keep the financed buyer | Repair first, then relist | Sell as-is for cash | |
|---|---|---|---|
| What has to happen | Engineer visit and letter, lender review, often repairs and a re-inspection, then underwriting resumes | Engineer, opening the walls, contractor, permit, inspection, then showings and a new buyer’s financing | Offer, purchase agreement, title work, attorney closing, deed and funds |
| Who has to approve | Buyer, lender, appraiser, sometimes the building inspector | Building inspector, then a new buyer and their lender | You and the buyer |
| Unknown repair costs | You usually carry them, or negotiate a credit | You carry them in full | Priced into the offer up front |
| Typical time | Weeks to months, if the buyer stays | Often several months before a new buyer, then roughly 45-60 days to close with a mortgage | As few as 7 days, or a date you choose |
| Main risk | Buyer walks at the contingency date, or the loan dies in underwriting | Repairs grow once walls are open | A lower price than a fully repaired house would get |
Listing can still be the right call. If the engineer’s letter comes back mild, the fix is small and well defined, and you have time, a repaired house sold to a financed buyer will usually bring the most money. The harder cases are the open-ended ones, where nobody can say how far the rot goes until the work starts.
How an as-is buyer handles the unknown
A cash buyer doesn’t have a lender to satisfy, so the engineer’s letter isn’t a condition of the sale. There’s no appraisal contingency, no mortgage underwriting, and no loan funding date that can slip. The buyer looks at the house, decides what the structural work probably involves, adds a margin for what can’t be seen, and makes an offer on that basis.
A cash offer comes in below full retail because it reflects the house’s as-is condition and the buyer’s own costs and risk, including the chance the sill rot runs further than anyone expects. What matters is your net: what you’d actually keep after repairs, carrying costs and the chance of a second deal falling through, compared with what lands in your account at a closing you can count on. Our explainer on how cash home buyers calculate their offer shows the math step by step.
Illustrative example only, made up to show how costs stack up: say a seller is quoted a range of $15,000 to $45,000 for sill and beam work, pays an engineer, holds the house through a few months of permitting and repairs, then lists again and pays commission. The real net isn’t the list price. It’s the list price minus the actual repair bill, which no one knew in advance, minus the months of taxes, insurance and utilities. Comparing that honestly against a firm as-is number is how you make the decision.
Where this tends to come up
These problems show up all over the state, but some housing stock produces them more often. Take a seller in Plainville, in Norfolk County, with a 1920s Cape whose basement has a beam resting on stacked cinder blocks. Or a Cape Cod cottage in Mashpee whose sills have spent decades in salt air and damp sand. Or a farmhouse in Plymouth where an old addition was framed onto a fieldstone foundation. In each case the house may be fine to live in, but it can’t get past a lender.
For more on houses with condition problems in general, see our page on selling a house that needs repairs.
Next steps when the engineer’s letter is the sticking point
If a lender has just put a structural condition on your sale, a few calm steps help whichever way you go:
- Get the inspection report and any appraisal notes in writing, so you know exactly what was flagged.
- Find out whether your current buyer will actually wait, and how long their rate lock and contingency dates allow.
- Get one engineer’s opinion if time allows. Even if you sell as-is, knowing whether the problem is mild or serious helps you judge any offer.
- Compare nets, not headline prices. Set the repair-and-relist path, with its range of costs, against a firm as-is number.
If you’d like that as-is number to compare, New England Home Partners buys houses in their current condition, structural issues included. We’re a direct cash buyer, not an agent, with a 5.0-star rating and 230+ homes purchased. We can usually give a no-obligation cash offer within 24 hours, and the closing process is the short list above, handled by a Massachusetts closing attorney on a date you choose. You can request your cash offer online or call New England Home Partners at (508) 286-7942 to talk it through before you decide anything.
Related questions
Why does a lender want a structural engineer's letter before funding a mortgage?
Does a structural engineer's report fix the problem?
Why won't contractors give me a firm price for structural repairs?
Can I sell a house with structural problems to a cash buyer without fixing it?
Get your free cash offer
Answer a few quick questions and we will get you a fair, no-obligation cash offer in 24 hours — no fees, no repairs, no showings.
- A fair cash offer within 24 hours
- We buy as-is, in any condition
- No fees, no commissions, no repairs
- You pick the closing date
Prefer to talk? Call (508) 286-7942.
Offer request received
We’ll review your property and reach out shortly.